Saturday, September 5, 2009

Every now and again I feel like I'm on the cusp of begin done. That is, I can see the finish. Then Iremember my track record for estimating these things and realize I'm like a year away.

I borrowed a tile saw from Mike a bit too early. I thought I'd be ready to tile in no time and, of course, everything has taken longer that I expected. The tile saw has just been sitting in my garage with all the fixtures and stuff I bought.


By the way, the garage was so full of stuff, that neither car could fit in. I think it will be that way for a while. There is tremendous satisfaction opening a box, installing whatever it is, and then putting the box in the recycle bin. The pile is slowly going down.


Most of the stuff I can't do until I tile (shower heads, toilet and fixtures), but the steam engine did come in and today is the day cause I need a break from everything else.


I ran electrical to the tub and outlets a while back and at that time I ran a very large diameter wire into the crawl space where I planned to put the steam generator. I did some research on these and chose the Thermasol AF SERIES. As part of my tendency to over-engineer, this sucker could comfortably steam the house. Anyway, you can install it above the shower in an attic or below, or someone nearby. I chose the crawl space. I built a cradle under the floor boards where there was water access and where I ran the electrical.



Basically this thing is pretty simple. You have freshwater coming in and steam going up through the floor and to an outlet in the shower. Once again, it's nice to have a 6" wet wall, which I didn't do, so everything was a bit tight.


Note the use of PEX pipe. Good stuff. Flexible and easy to install, but the connectors are expensive. Her eyou can see that I haven't secured them yet.


Nothing much to tell on this day. I got it done. Or at least I think so. Like so many other things, I can't test it because the shower isn't done. I won't know if this works until I've tiled the shower and installed all the fixtures.

Sunday, August 30, 2009

Time for drywall

The great thing about the Explorer is that you can get a 4x8 sheet of drywall in it. It sticks out the back a bit, but it works pretty well. I've got a lot of white scuff marks on the inside. I'll clean that up at some point.

Drywall always seems easy and then for some reason it takes a long time. The ceiling was hard. I didn't use a lift or anything since I only had a few pieces. One way to do this is to stand on a ladder, hold the drywall firm against the 2x4's with your head, take the screws out of your mouth and screw them in with a heavy drill, you can get this done by yourself with no problem. I broke one piece and after 1/ 2 hour called Jen in to help.

Nothing too exciting to tell about this phase. I put cement board around the tub and drywall above that. Drywall everywhere else. Thought I'd get fancy/shmancy and put a little cubby in the 1/2 wall next to the toilet to put rest an airfresher or some other do-dad. By the way, this wall is full height but sticks out from the wall about 2 1/2 feet. It separates the toilet from the bath sinks and provides some privacy to the toilet area. I figured this would be a great place to use the less expensive and easier to handle 1/4 inch drywall and not the 1/2. I'm so smart.

In the picture to the right you can see the wall I was talking about framed out. Also a ladder, deck for the bath, cement board, my level which I can never seem to find when I need it, and some general rubble.

I had arranged for a drywall guy to come by a few days ago. My think here is that I did a rotten job on the wall treatment on the closet and I wanted a specific treatment on the wall. We're going for an Italian plaster look here, not a oversprayed orange peel like what I did before. So this guy showed up to take a look and had a few polite comments. First of all, I'm an idiot for using drywall nails in some places. Apparently nails work their way out over time. I'm also an idiot for using 1/4 inch drywall. Guess I'm not so smart. The reasons here were less clear, but this guy was 83, had been doing this his whole life and was charging me near dirt. So I didn't argue.


The "skip trowel" method looked easy but I'm certain it would have taken me a week and I would have never been happy with it. It took this semi-retiree finished it in just over a day. I also had him clean up a few areas in the bedroom that had cracks in the walls. This guy was great.


So let's see. I did okay working out the places for the pipes and outlets in the drywall, that's always a bit tricky, and I did a good job bringing in a professional to hide or fix all my drywall mistakes. I'm feeling Pretty good.
I don't have a picture of this phase so here's a picture of my shower gift wrapped in vapor barrier. If you look closely you can see the overhead plumbing for the "rain" shower head.