Saturday, November 14, 2009

The Tools it Took

I've been travelling for work for about a month now so I haven't done much work on the bathroom. I think that's come to an end so I should be able to get back to it this weekend. For now though, I thought I'd share something that keeps occuring to me when I think about the budget.

In the begining, I created a project budget spreadsheet and included the normal stuff. The stuff I guessed on and was horribly, horribly off included, lumber (2x4's, plywood, etc), copper pipe (angles, connectors, etc), basically everything having to do with the plumbing, electrical wire (three separate lines pulled from the box to the bathroom). Basically I thought of these things but I was okay being off in my budget because I didn't want to spend the time creating estimates for this stuff. But now that I am where I am, I can see there were a lot of other hidden costs that I didn't expect at all...tools. Let's take a look:

Amounts are approximate
Dewalt nail gun - $129 Not entirely necessary, but it is now my favorite tool
Nail gun nails - $45
Compressor - $60
Drill - $100 (normally I wouldn't inlude this but my drill fried on this project and I had to get another one. Seriously, it actually started smoking and then caught on fire. I yanked the cord out of the socket and then quickly threw it out on the driveway, as if it were a grenade. It continued to smoke and melt for another hour. I inlcuded this in the cost even though this was a gift. Sweet!
Diamond blade for handsaw - $45 (used for cutting curved pieces of tile)
Cement board cutter - $5
Glass cutter - $10
PEX tubing cutter - $15 This can get really sloppy without one of these.
PEX tubing crimper - $30 rented (yeah, these things are really expensive - best to rent if you're organize and can do it all in one day).
Electrical tester (to test resistence for the heated floor) - $45
Router bits for mortise and tennon joints - $99
Saw blade - to make quality cuts for the cabinets - $75
Porter Cable orbital sander - $100 + sandpaper $20
Paint brushes/staining brushes - $25
Tile saw - Borrowed this from Mike. Absolutely invaluable.
Trowel - $10
Drywall texture sprayer - $100 (hint, buy a good one or not at all. Mine was not good)

Tools I already had that are mandatory:
Hand grinder
Table saw
Sawsall - I love this tool
Pipe sweating gear
Drywall square, knive, floor-lifty-seesaw thing, etc
Variety of normal hand tools including a crowbar
Radio (thank you NPR)

I bet there's more but I can't think of anything else right now. Normally I am really excited if I need/get to buy a new tool. But interestingly now, I'm so far over budget that I now shudder at that and try to improvise (using a big screwdriver as a chisel, using wood bits for mason bits, really smart stuff like that).

Let me know if you need to borrow something.

Saturday, September 5, 2009

Every now and again I feel like I'm on the cusp of begin done. That is, I can see the finish. Then Iremember my track record for estimating these things and realize I'm like a year away.

I borrowed a tile saw from Mike a bit too early. I thought I'd be ready to tile in no time and, of course, everything has taken longer that I expected. The tile saw has just been sitting in my garage with all the fixtures and stuff I bought.


By the way, the garage was so full of stuff, that neither car could fit in. I think it will be that way for a while. There is tremendous satisfaction opening a box, installing whatever it is, and then putting the box in the recycle bin. The pile is slowly going down.


Most of the stuff I can't do until I tile (shower heads, toilet and fixtures), but the steam engine did come in and today is the day cause I need a break from everything else.


I ran electrical to the tub and outlets a while back and at that time I ran a very large diameter wire into the crawl space where I planned to put the steam generator. I did some research on these and chose the Thermasol AF SERIES. As part of my tendency to over-engineer, this sucker could comfortably steam the house. Anyway, you can install it above the shower in an attic or below, or someone nearby. I chose the crawl space. I built a cradle under the floor boards where there was water access and where I ran the electrical.



Basically this thing is pretty simple. You have freshwater coming in and steam going up through the floor and to an outlet in the shower. Once again, it's nice to have a 6" wet wall, which I didn't do, so everything was a bit tight.


Note the use of PEX pipe. Good stuff. Flexible and easy to install, but the connectors are expensive. Her eyou can see that I haven't secured them yet.


Nothing much to tell on this day. I got it done. Or at least I think so. Like so many other things, I can't test it because the shower isn't done. I won't know if this works until I've tiled the shower and installed all the fixtures.

Sunday, August 30, 2009

Time for drywall

The great thing about the Explorer is that you can get a 4x8 sheet of drywall in it. It sticks out the back a bit, but it works pretty well. I've got a lot of white scuff marks on the inside. I'll clean that up at some point.

Drywall always seems easy and then for some reason it takes a long time. The ceiling was hard. I didn't use a lift or anything since I only had a few pieces. One way to do this is to stand on a ladder, hold the drywall firm against the 2x4's with your head, take the screws out of your mouth and screw them in with a heavy drill, you can get this done by yourself with no problem. I broke one piece and after 1/ 2 hour called Jen in to help.

Nothing too exciting to tell about this phase. I put cement board around the tub and drywall above that. Drywall everywhere else. Thought I'd get fancy/shmancy and put a little cubby in the 1/2 wall next to the toilet to put rest an airfresher or some other do-dad. By the way, this wall is full height but sticks out from the wall about 2 1/2 feet. It separates the toilet from the bath sinks and provides some privacy to the toilet area. I figured this would be a great place to use the less expensive and easier to handle 1/4 inch drywall and not the 1/2. I'm so smart.

In the picture to the right you can see the wall I was talking about framed out. Also a ladder, deck for the bath, cement board, my level which I can never seem to find when I need it, and some general rubble.

I had arranged for a drywall guy to come by a few days ago. My think here is that I did a rotten job on the wall treatment on the closet and I wanted a specific treatment on the wall. We're going for an Italian plaster look here, not a oversprayed orange peel like what I did before. So this guy showed up to take a look and had a few polite comments. First of all, I'm an idiot for using drywall nails in some places. Apparently nails work their way out over time. I'm also an idiot for using 1/4 inch drywall. Guess I'm not so smart. The reasons here were less clear, but this guy was 83, had been doing this his whole life and was charging me near dirt. So I didn't argue.


The "skip trowel" method looked easy but I'm certain it would have taken me a week and I would have never been happy with it. It took this semi-retiree finished it in just over a day. I also had him clean up a few areas in the bedroom that had cracks in the walls. This guy was great.


So let's see. I did okay working out the places for the pipes and outlets in the drywall, that's always a bit tricky, and I did a good job bringing in a professional to hide or fix all my drywall mistakes. I'm feeling Pretty good.
I don't have a picture of this phase so here's a picture of my shower gift wrapped in vapor barrier. If you look closely you can see the overhead plumbing for the "rain" shower head.

Saturday, August 29, 2009

More shower

Staying focused on one thing and maybe one day actually finishing something I start would be a nice change. So in that effort, I've decided to stay focused on the shower. It's got a cool concrete shower pan and bench in there now. Course the plumping is done. And at this point, standing in my shower and staring at the pipe ends that will one day become my shower heads, I realized something. It turns out that I measure the optimium height when I was standing on plywood. Now I'm five inches higher and that shower head is lower. Normally this would be a big mistake, but I wanted a really tall shower head so you never had to bend down for any reason. Now I have a "normal" height shower head. Dodged a bullet.

Cement board is easy to hang but a pain to cut if you're cutting small, intricate cuts. I sacrificed a blade on my jig saw. I'm sure this isn't the recommended method but it worked quickly for me. Lots of stupid holes for the valves and shower heads had to be done. The ceiling was tough. That stuff is kind of heavy.

I had another general question about steam showers for which I found no answer. If you want the whole thing completely sealed (basically water proof) so that the steam doesn't go through the tile and into the walls, then it seems it's a bad thing to punch a hole in the vapor barrier for the shower heads and knobs. I mean, it's got to be done. I don't know how other folks overcame this. I think they don't do anything at all and figure the shower vapor barrier is "mostly waterproof." What I decided to do was make the holes as small as possible and then squirt a bunch of silicon caulk in there to seal vapor barrier around the pipes. Couldn't hurt.

Cement board is up, everything is sealed (I think), and the thing is starting to look like a shower. Or at least a small, grey room with a bench that slopes ever so gently toward the drain.

Friday, August 28, 2009

The Shower Pan

I haven't blogged for a while. Mostly because I've just been staring at the "Disaster Zone" and wondering how much it would cost to have someone finish. But then Jen made me some chocolate chip cookies and now I'm back on top.


The internet provides a log of good information on how to do stuff and the comment boards out there help too. So I was surprised to find how little information there is on building a steam shower, and in particular, building a shower pan. It mostly comes down to liners and stuff but you'd think someone would capitalize on this gap.


I'll skip a few steps here, but it starts with the pan. I had to make sure much earlier in the project that the floor could support the tub, 60 gallons and two people, along with a cement shower pan. Basically there are a few layers here. I used concrete grout made by Quickcrete. This stuff is designed to repair bridges and is much easier to work with than cement. I poured a base which is just designed to slope in toward the drain and support the pan. There was no guidance at all from anyone on the building the curb (where the door to the shower will be). I framed it out with 2x4's but what to do to make it part of the shower pan was not clear. Since I'm pouring mortar, I just decided to make it a wall of mortar. I made a mold, poured the mortar and had a pretty little wall which would be where the door was. Not sure how the pro's do this.


Once that hardened, I could put the liner down. This is basically a very thick plastic that HD sells for this purpose. It's very hard to fold in the corners. At this time I put in the thiner vapor barrier (Plasic sheet) around the whole shower. If you ever do this, get someone who is good at gift wrapping. You're basically wrapping a box with a single sheet of plastic, while standing in the box. The fewer cuts I had to make the less of an opportunity there'd be for water to get through.
Once done, I could then work on the drain and put all that down (skipping ahead quite a bit here). Then I mixed up a lot more quickcrete and basically poured and formed my shower pan.


There's a pretty accurate description of the process with pictures here. http://www.ontariotile.com/preslope.html This looked pretty much like mine.


The fear facor came in when I realized that if I had made a mistake of some kind, I now had 100 pounds of hard mortar in my bathroom. Anyway, at the end of the day today I had a liner in there and a new shower pan. As long as water goes down the drain and not down through the floor, I'm going to be happy.


Monday, August 24, 2009

Closet doors

I hung the closet doors today. I bought the three closet doors but they were unfinished. I found out that you need to pretreat pine so that the stain doesn't get blotchy. What I did find out is that it can get blotchy anyway. So I'll make this entry quick. I thought staining was easy, but it isn't. You can have streaks and stuff just like paint. Doors are trickier because of the panels and grooves and such.
I had a really hard time finding a tripple bypass door hanging system. I finally found one that wasn't $300 sold by Johnson. Anyway, I had stained the doors and then put coats of urethane on various days since I started the project. They've just been down in the basement drying because I don't like staining or cleaning the brushes. Oh and in one case I had to sand one side down and go again. Blotchiness.




I also had to made the floor tracks for the doors. I basically took a long 1x6 and cut three grooves down it with the router. More staining for that thing and finally I was ready.


The picture at the right also shows the bathroom door. It came in late so I didn't stain them all at the same time.
I need batteries to show the final hung doors. I'll take a picture later.

Friday, August 21, 2009

Time to test the water

The plumbing on the shower and the tub are done. I just need to put the valves in on the sink and plumb the toilet. The fauctes for the sink are going to be coming out of the wall. They look pretty cool in the pciture but I've never done this before. My big problem is how deep in the wall to mount them see, they have to stick out a specific amount so that the pretty part of the faucet is flush with the wall. My issue is that my wall includes drywall, tile and an indeterminate amount of mortar.

I've been avoiding this for some time but today is the day. I measured some 12 times including two eyeball / sanity checks. They have to be centered in a space that isn't complete yet so it's a bit tricky. They also have to be the right level above a sink that isn't there yet. The actual installation isn't that hard. I put a 2x4 in the wall and screwed the bracket that holds the valve up to it. Then remeasured just for fun to make sure. Good thing I did too because after all that I was off by 1/2 inch. I took it down, and moved it then remeasured. Then determined I was right the first time and moved it back. Jen decided it was lunch time so I quickly agreed to stop.


More sweating of pipe with trusty torch. By the way, I didn't factor any copper pipe into my budget. Copper pipe is expensive. A little while later the valves to the sink were connected to fresh water pipes.

The last bit was taking fresh water to where the toilet was going to be. This toilet calls for water to come out of the wall and not the floor. Means a few more bends and stuff but wasn't my biggest problem today. I plumbed that and capped it off so that I have a pipe sticking out of the wall waiting for my toilet..one day.

Okay, now to test the water. The tub plumbing is completely done and I put plugs into the outlets of all of my shower fixtures (body sprays, overhead, etc). The valves on the sink will contain the water there, if they're turned off. It's kind of hard to tell. And I capped off the toilet water by welding a cap. So, in theory, if the water were turned on, no water would come out.
I asked Jen to get into the crawl space and showed her the master on/off valves. She can also hear me through the floor. This was pretty nerve racking stuff to be honest. I've had my welds fail before on other projects. I yelled down to Jen "okay, turn the cold on just a wee bit." Folks, it's a bit terrifing when you hear all that water charging the system and you know pressure is now behind all the work done by an unlicensed plumber. We did the hot and eventually worked up to full strength. I don't know what to tell you. It worked. No leaks. Well, except one.
Remember me telling you about the compressions fittings for the tub faucet? Yeah, a very slow leak appeared. I tightened, thentightened some more, then tightened too much and bent the pipe and the leak got worse. Back to McGukins. Tried again. Failed. Back to McGukins. This time buying far more than I needed. Tried again. I was up to three leaks at one point. These are very small leaks that take a while to even see. But they have to be fixed. This was pretty frustrating stuff. But after some 5 attempts including rebending and installing the tubing, it finally worked. I hate compression fittings.

So the water is on. The sinks, toilet, tub and shower pipes have pressurized water in them and I'm not screaming down at Jen "Turn it off! For the love of god turn it off!!!!" I was so surprised by this I sat in my shower chair for about 1/2 hour just staring at the plumbing.


Thursday, August 20, 2009

The tub doesn't fit

So the jetted tub has been in my garage for a while. I created the deck using the template they provided. Kind of a big oval. So I created the frame for this thing and then put the deck down. Then just for fun I measured the oval against the tub. Yeah, it doesn't fit. No seriously. The opening accomodates the rim of the tub but not the two motors, pipes electrical thing a ma bobs that are all permanently mounted to the tub. So, I took the deck off and called Mike. I needed someone to help me carry it into the house.


I had measured the sliding glass door and the new doorway to the bathroom to make sure the tub would fit. But now that Mike was on his way, I panicked and measued again only to find out that now the tub wouldn't fit through my newly framed door. I quickly set to work tearing down the jack studs. By the time Mike got here I was done and we carried the tub in with little problem. Turns out, I forgot that I had planned to turn the tub sideways and didn't have to tear apart the door. This by the way is only one of a hundred similar mistakes that I've omitted mostly because I've blocked them from my mind.
So the tub's lowered in and I decided to start on plumbing. The access is there so why put the deck on when I don't need it yet. The drain part came first. Nothing terribly interesting to tell you there. I did test it with a bucket of water. This is a good time to mention that your drain should be installed with plumbers putty. Quick fix. I think even the pros make that mistake.
Fresh water. The lines in the crawl space went in as expected. I put in extra valves so that I could shut off the tub, independent of the whole bathroom. Once I ran the lines up to the tub valves then I encountered trouble. The hot and cold runs to a waterfall faucet. They use compression fittings and 1/4 copper tubing. This had to be bent. Suffice to say that a compression fitting and tube must be in pristine condition to keep from leaking. Well, you bend this and that doesn't happen. This took two trips to McGukins because I was optimistic that I could get it right on the next try.

So now I have a tub sitting in an open frame. It's mostly level, and the plumbing seems to be holding. It looks pretty cool.


(To the right you can see more of the shower plumbing and my favorite chair where I sit for long periods wondering how much trouble I've gotten myself into).

Wednesday, August 19, 2009

I'm really unqualified to be doing this

So I've got my shower framed in. What it needs is some plumbing. Actually, so does the toilet, the tub and the sinks but the shower is what I'm most afraid of. My dad always said, when it comes to home improvement, face your fear. Actually, that may be been Tim "the tool man" Taylor. Anyway, I was more or less excited to get this going so today I started plumbing.


First I made sure Jen was on ready alert with the fire extinguisher. Next I returned to the scary crawl space and ran a line from down there up through the floor. There was some drilling involved but by now I had purchased a dill bit set and was well equipped. The tools I keep buying by the way, yeah, they're not in the budget. Jen's been pretty understanding so far. Might be the medication.


Okay, so during this time there were some four trips to HD, Lowes, McGukins and HD again. Mostly because when the shower fixtures come, they come with the valves and the valves don't have installtion instructions. They just figure that a certified plumber is going to be doing this work, not a cheap bastard with a MAPP tortch.


I plumbed up to the main temperature control valve. Sounds cool eh? So we'll one day have a shower that has separate temperature and volume (on to off) valves. I put that on and then realized I better brace it pretty quickly because it weighs some 20 pounds (or thereabouts).


There are three sections from here. One goes off the the right to an on/off valve and then on to the normal shower head. The other goes to another on/off and then to an over head shower head called "Rain." It's four shower heads all combined in one. I've never seen it working. Just looks awesome. The last are two body spays that are mounted on the wall. All of these are flat. That is, they don't stick out from the wall. They're called water tiles. Kohler makes them. They're cool. I'm hoping I don't break them.


I'm sweating all of this 3/4 pipe to brass fittings. The trick here is to get it hot enough to melt the solder but not melt the wee plastic pieces inside the expensive valves. My problem in the past also included welding one angle but through heating it up, weakening the weld I just made. Basically, I worked quickly and used a wet towel to cool the previous weld. I'd like to say I never made a mistake, but that just wouldn't be my style. But through carefully measuring, cutting, sweating, breaking the welds, cleaning measuring again, cutting and sweating again, I got it done.


Now, here's the fun part. I can't check the welds. If I turn water on, well water might come out and go all over my unfinished shower. There are plugs that I can buy to screw into the valves and then turn it on. I may need to do that. Anyway, this is done. Until I find out it leaks. Then I won't be all that done.

Let's poke holes in the roof

If you're tyring to figure out why I did this before finishing that, I have no answer for you. Basically I've found that when I reach a problem, I avoid it and ponder it while doing something else. So today I jumped over to putting in the ceiling fan. It was a nice day so why not poke a hole in my roof.

I read up on this a bit and with the proper installation and lot of tar caulk (not the exact name), I should expect 20 years of leakless venting. Course, the "my luck" factor combats that bringing it down to about 7.

So basically, I found a lovely spot in the middle of the bathroom and poked a hole in the ceiling. Then I went into the attic (an extremely hot, insullation filled space with about 3 feet of headroom). Found the hole I poked and installed the fan there. Then eyeballed where the vent in the roof would go and did basically the same thing. Then I climbed up on the roof and found the small hole I just drilled. Now all I had to do was saw out a larger hole for the vent. Cutting a hole in your roof is not a natural act. I remembered my insurance agent. I remembered the nice lady who gave us the big loan on the house. Then I steeled my nerves and went for it. Now get this, it rained tonight. Yup, I didn't get much sleep.

Tuesday, August 18, 2009

Let's start framing




Okay, so I started framing. Basically there's a few things to do. The shower is the most important so that I can finish up the plumbing. After that there is a half-wall to hide the toilet and and the platform for the tub. Oh and I have to frame a decent window and then frame a door. There wasn't a door into the bathroom before.






The shower is going to be a steam shower. Besides buying a steam engine, and running the dedicated electrical line and plumbing for that, I found out that this also means a few other things. First off, no natural stone. Water vapor will make it through into the walls and do bad things. Second, there seems to be a debate about whether to slope the ceiling. This is very important. With a flat ceiling, condensation will collect rapidly and drip furiously down upon you as you're trying to relax. Lastly, the entire shower (walls and ceiling) must have a vapor barrier.


I been measuring out my shower for weeks and think it has the right dimentions. Not too small or too large. So, the framing began. Two indespensible tools in this category. First, the miter saw. I love it. it's so amazing. Second is the nail gun I purchased for the construction of the closet. I can't tell you how fast the work goes. Now all I have to do is make is square, which I more or less did. I'm telling you, it's not as easy as it should be. I measured, marked, had my speed square handy and it was still a bit off.

Another note on framing a shower. Use 2x6's on the wet wall. You can squeeze it all in using 2x4's but if you can avoid that headache, do so.
Next I tackled the door. Here you get to deal with terms like king studs and jack studs. Basically this is pretty straight forward. Squareness is again important. I'm getting better at it.
Framing the window was pretty scary. That involves poking a hole into a perfectly good wall. You know, one that leads to the outside where snow and wolves are. My window was sitting in the garage so I felt pretty solid about how big I had to make this. I tried to be careful so that I would not destroy the outside panneling. It didn't work out and they don't make the exact kind of panneling anymore..of course. So, I'm hoping that gobs and gobs of paint will hide that fact.
The tub. Yeah, this was hard. Everything must be level, square and perfectly plumb. I had exact dimentions for the tub as provided by Jason tubs. The deck, was created out of 3/4 plywood using my jig saw. I have a crappy little saw. This took a while.
So the above took a few days all told. I'm wrapping it up here for reader convenience. I sure wish I had a jaccuzzi to relax in.

Wednesday, August 12, 2009

Plumbing

Okay, so the Y and T connectors for the vents are ready to be connected to, but I haven't framed anything in the bathroom, so I won't be able to finish the venting until later. Here's when I took my trusty rag and shoved it into the opening to prevent noxious gas from escaping into the sterile environment of my workspace.

So today we turn our attention to fresh water plumbing. Basically, I just needed to run lines to the future location of the toilet, shower, and tub. Actually, I just need to bring the lines close to that spot and rough it in. The existing piping for the sinks sinks is about 6" off from where it will need to be, but I'm going to put a bend in that when I get to that portion of our show. I capped off the water line for the toilet during demo so now I need to turn off the house water main and start cutting and sweating. That's when I started thinking about water pressure. My plan calls for a shower with water jets, a normal shower head and an overhead, 4-head "rain" system by Kohler. The tub is decent size and we've got two sinks. I'm a little worried about water pressure. Back to the internet.

The recommendations from Kohler were for 3/4" pipe instead of the standard 1/2". More flow. Makes sense. Course, that means that the primary hot and cold lines coming into my bath are inadequate. I traced the lines back and in my basement above the pool table there actually are 3/4" lines that split off and become 1/2". I could just extend that into my bathroom. Course, I wasn't really planning on this change either.

Okay, after a trip to HD, I was back and prepared to open a line in my basement that was directly over my pool table. Subsequently, this was VERY dangerious work. I cut, put in my connector and began to sweat the pipe. It didn't work. This took many attempts, many cuts and lots of swearing. Once back at HD, I asked about this and the problem is that the line that still connects to fresh water is cold and likely still wet. Apparently an old trick is to shove a piece of bread up in the pipe. The bread absorbs the water and eventually disolves. This allows a dry opportunity to begin the sweating. This was still tough and because it wasn't completely dry, the weld didn't hold and it leaked. I had to break it apart, sand, cut...more leaks.. wash, rinse repeat.




The image to the right show my 3/4" pipe headed into my bathroom. A plumber would not give me any points for prettiness, but it worked so I'm movin' on.



Each time I want to do something with the water, I have to turn the house main off. This is one of those old round valves that is already showing signs of moisture around it. So I say a little prayer to the gods to keep the valve from blowing off while I'm turning it off and on. To avoid this, I thought it would be a good idea to install shut off valves for just the bathroom. For whatever reason, I couldn't make this happen. I bet I shoved an entire baguette up that pipe and it still wouldn't sweat. Just kept breaking off in my hand. Now each time I fail I need to break this thing off, sand and in one case, go to HD and buy a new valve. It was getting late and Jen would likely like to have some water in the house before too long. I went back to HD to find some kind of miracle. I found it in the form of an expensive connector called a SharkBite. Simply put, they just connect to copper pipes like tinker toys. You can put them on and take them off all day, and they are approved for behind-wall use. I would never use anything else expect they are expensive. The only bad thing here was that I spent most of my day overcoming this problem and buying more pipe before I came to this solution.

The water is back on, nothing appears to be leaking, the pool table is intact and Jen doesn't know how close we came to a flooded basement. I'm golden.

Tuesday, August 11, 2009

Staring at the walls

I spent a good part of the begining of this day sitting in a chair in the bathroom approximately where the bench will be in the shower. One of the problems I have is knowing what to do next (or first) so the next step is easier. I started making daily project lists just so I wouldn't stall. I've actually sat in this seat for over an hour at a time completely paralyzed. So for instance, I can't run the vents up to the roof until I frame in the shower. I can't frame the shower until I know the exact dimentions on the tub which will border the shower. I also need to know the exact dimentions of the shower, which is largely dicated by the bench size, where I am now sitting. I've often asked Jen to bring me my dinner in the shower.

By the way, I now have in my garage the jacuzzi tub, toilet, shower fixtures, steam engine, towel racks and other stuff I bought. All told, there's quite a bit of cash encased in cardboard in what is now a very dusty garage. Oh, and in case you're interested...I've never installed a toilet or a toilet, made a shower or plumbed a shower. I have hung a towel rack before.

Course, I still have more plumbing to do. I'd better get going.

Monday, August 10, 2009

Where the drain goes

Today began as most do with a trip to HD. By the way, Lowes is only marginally farther away but I found that by shopping at just one store for most of the stuff I wouldn't have to remember where something came from when I wated to return it.


So now I know where the drain goes. It goes down over there and then meets up with the drain from a sink or something, then sort of goes over there and meets up with a large, vertical tube called the Main Stack. All of the tubing I'm removing has served for 35 years carrying stuff I don't want to think about so I tried to get Jen to make the cuts. That didn't work so I doubled up on my gloves, put on my welding mask and a hoodie and got down to business.

Now at this point in the game the studs are exposed, and I've torn up a section of the floor and exposed the crawl space below. The exsiting waste tubing is there, along with the exisitng fresh water piping, electrical, and a lot of HVAC. I pasted the Plumber Tom Approved Plan up on the wall to give me comfort that I wasn't destroying my house and began cutting. During this process, I went to HD three times, purchasing parts and returning pieces that I didn't think I needed but later purchased again. One other note on going to the same place to buy supplies. The people there get to know you and you get to know them. I was able to determine who was a really good plumber and who was just some shmo assigned to the plumbing section. Over the last while we've gotten to know each other a bit and a couple of the good ones have given me some good tips and verified the information I got from the internet.

The good thing about working with tubing is that it goes together super easily. The bad thing is that the glue actually bonds with the plastic and becomes one, so this stuff is never coming apart. Once you goof, you're cutting. I cutted.

I'm getting more comfortable crawling around in the crawl space. It kind of creeped me out at first but with some of the floor removed and the radio on, the 2 1/2 foot dirt area is becoming more familiar.


By the end of the day, I had my level out and measuring tape to ensure the proper downslope. Turns out that too much slope can be bad too, so there's an actual need for accuracy. I had to move one of my HVAC vents that was in the way (that means a completely different trip to HD). The waste tubing is all in there now.




Saturday, August 8, 2009

Waste Plumbing

Okay, so I have a new plan. Jen's plan didn't work completely but in general we're going with her suggestions with a addition of a half wall and some other stuff. So today I marked out stuff like where the toilet drain needed to be, the shower drain, the tub, sink water lines etc. This required that I look online and find out the dimentions for the tub drain for the tub that hasn't arrived yet. The Kohler toilet we bought came with a handy-dandy plastic template. I'm making the shower so basically that drain can go anywhere and the sink drains will be close to the same spot they are in.

Now, a word on venting. You know those strange pipe that stick out of your roof? I always wondered what those where and why they were open. Bugs or something could get in the house right? Turns out these are plumbing vents so any bug that climbed down one of these would be a certain gonner in my house. But the drains and waste venting also have a lot of rules around it like slope, distance from main stack, number of drains on a single waste pipe, vents per water feature, etc. I should mention here that I don't know a thing about any of this. It was back to the books and online. The deal here is that there are codes around this stuff and since each bathroom is unique, there is no "one way" to do this.

I took some time to tear up a portion of the floor. This again, is hard. I guess these things are meant to stay down. I wanted to preserve what I could and make it easy for me to put a new portion of the floor down. Bascially I just ended up setting my skill saw at 3/4 in and went to town with the saw and later my trusty crow bar.

The toilet was just about the maximum distance from the main stack and that while I came up with a plan, I started getting nervous that once put in place, I'd never know if it worked until the entire bathroom was completely finished. So, I called a plumber and asked for the most senior guy.

This guy came by in no time. I think he was really interested in this job. I wasn't asking him to fix a leaking pipe, but rather to review my paper plan and view the construction area and give me some advice. This was great. I wanted to do everything myself, but this was good money spent. He confirmed the stuff I knew and then told me some things I didn't. He changed my plan a bit and then instead of charging me his hourly rate, just asked for $60 and gave me his home phone in case I had any follow up questions. Then we chatted about my plans for the bathroom. Everyone always seems to ask about the shower. I'm curious about that myself to be honest.

Friday, August 7, 2009

Let's change the plan at the last minute



It's easier to see the lay of the land and plan things out when all the fixtures and walls and stuff are out of the way. So I returned to the plan and marked the floor with tape. Good to check stuff like this out anyway. Code considerations can be illustrated as well like, the toilet has to be 16-odd inches from the wall, where the electrical outlets will be and is there enough room to walk around in the shower. I had this plan all worked out in sketchup. I'd had it for weeks/months since the planning doesn't cost anything. But now that I'm knocking down walls....


I decided to bring Jen in again just to show her my plan now that I was down to studs. Nothing was going to be where it was before sadly. The toilet was going to be on other side of the room, the shower oriented differently thereby requiring a plumbing change, we never did have a tub. And all the electrical would be new and in new places. Jen saw my plan with everything taped out and well, had some "suggestions." Unfortunately for me, her suggestions were good ones, only irritating me further. Basically she suggested that the shower go over here and the toilet over there. Stuff like that.



I pulled up the tape and laid out a new bathroom.

Thursday, August 6, 2009

The Demo

So I came up with the idea of using regular wood doors as bypass doors. This closet is right across from the bathroom and I’m going to put up a really nice wood door on the bathroom. If I match all that, it will work. I spent all day searching for a triple bypass door hanging system that would support three wood doors. This was not easy. At the same time, I had to select the larger but matching door for the bathroom. The place in Boulder was competitive so I went down and ordered it all. It’s knotty pine. Knotty Alder is better, stains better and smells better. Alder is far more expensive so we’re going to live with smelling pine.

The doors are going to come unfinished. How hard could it be to stain a door? Just kidding. With my luck I'll stain it with acid or something and be screwed. Well, at least I have a plan. The concern is that the overall thickness of three doors is larger than the width of the wall. Yup, gonna figure that one out some other time! Onto demolition.

I watch a lot of those do it yourself shows. All of them pretty much start with demolition. They always make it look kind of fun. You grab a sledge hammer and have a ball. The reality is that this is not so easy. First off, when you break through the drywall, dust goes flying and your wife might cry out about all the clothes she just got done cleaning. The other thing is that you have to have somewhere to throw the debris. I called HD on their take-away bin. They advertise it in several places in the store. Course when I called no one knew anything about it. We elected to pile all the debris into an enormous tribute to deconstruction in the garage until a removal plan was actually devised. For the sinks and spanish-esque fixtures, I took those down to the building supply recycling place here Eco-cycle. He took the shower, mirror doors, and everything else but very reluctantly took the lime green counter.

I tried to pull everything down in big pieces. This added some time and don't know how worth it it was. First I pulled out the mystery material counter/sink. Then came the cabinets. Note to do it yourselfers. The cabinets work as a great work bench out in the garage. Taking the toilet out was nasty work. I tried to get Jen to do it but that didn't work. The shower came next. The plastic floor of the shower was bracketed to the floor in some mysterious way with commercial grade bolts. That part of the floor needed to come up anyway. A crowbar is a very important tool.

You can kind of see in the above picture a dowel-like thing at the entrance of the bathroom. I've removed them now and I still have no idea how they were installed. The sawsall is a very important tool.

Wednesday, August 5, 2009

Just make your own closet doors

So I saw these bypass doors in HD that I really liked. They look kind of like a cabinet door where the panel is frosted glass. Turns out they are dang expensive for the size I need. I figured I was eventually going to make the cabinets for the bathroom, so I should make these too.

Today was about measuring and planning, and more measuring. I went and bought the hardwood at a specialized lumber shop. It’s pretty cool buying nice wood. In this case, it was maple.

I hadn’t figured out the frosted glass but figured I could get that easily enough. But then I felt odd about it and drew a scale model on cardboard. That’s when I realized that these doors are really wide. Maybe I should call and make sure someone has this before I start cutting up the wood. Turns out, frosted glass is really, really expensive. You can put a frosted film on regular glass, but even that is dang expensive. You have to use a safety glass inside. So after adding it up, the doors at HD are less expensive than what I could build it for. Back to HD.

Yup, you guessed it, HD doesn’t have any remaining in this size and they aren’t selling them anymore. Yup, they're not selling them anymore. None where advertised online and so my closet doors are basically no more. Yea. So they're too expensive to make and I can't buy the ones I wanted. Juuuuuust great. The guy at the lumber shop was nice enough to take the wood back.

Tuesday, August 4, 2009

Even more drywall

So if I really cared, I would sand more but I started to think, you know, most people can’t even see the walls in a closet. Slight blemishes here and there won’t even be see. Onto mudding without further ado.


I hooked the sprayer up and away I went. This thing clogs up with some regularity and it is something of an art form to get it right. If you concentrate in one area for too little or too long, it will look funny. One other thing I found out is that it doesn’t work when spraying the ceiling. See, the bucket on top of the sprayer doesn’t have a lid. So you can’t just spray straight up. So I angled upward and walked around in circles in the closet until I got it done. At this point I have a new closet with finished walls and a plywood floor. I saved the carpet from the old closet and figured that would do. Course I don’t have any of the tack strips so it was off to HD.

I bought the tack strips for the carpet and some new trim. I threw the trip up and then went to town painting. Luckily it’s a pretty small space so it went quickly. I hate priming as you basically have to do everything twice. I’m also bad at cleaning my rollers in a way that they can be used again. I don’t know how pros do this. They always end up clean but crunchy. Another thing here is how to properly clean off your things with paint. Does it just go down the sink? Seems bad. I am uncertain on this so let's not publicize what I actually did. Anyway, the closet is painted and it reasonably matches the color of the room. I put the tack strips down and then hammered the carpet into the strips. You’re supposed to stretch it out, but I figure at some point I’ll put down cedar floors or something. So I just put it down with the old pad. It looks okay. There’s a 3 ½” gap between the hallway carpet and the reused carpet in the closet since this is where the wall once was. I’ll figure that out I guess.

Number of trips to Home Depot is getting high. I spoke with Ralph today. He suggested that any good home improvement project involves one person doing the work and another person whose sole job is to wait in the HD parking lot with a fully charged cell phone. Once he gets the call, he goes in and purchases the item, brings it to the house and then returns to the parking lot for further instructions. I laughed so hard at this absurd concept. Later on I started thinking about who I know with a truck.

Monday, August 3, 2009

More drywall

I searched around for a drywall treatment sprayer. The rest of the house is done in orange peel so I looked for that. Lowes had one for $60 that was a cheaper version of the professional version. Basically, you mix up your mud, put it in a big container , turn on the compressor and spray away. First I had to tape and figure out all my joints. Basically, I suck at this. I’ve seen guys take a trowel and spread tape and mud in one swipe and require no sanding. This is not me. I struggled all day and it looked pretty crumby by the time I was done.


I tried to be more careful with the taping on the inside of the closet, but really I wasn’t much better. Doing the ceiling was hard and I found there was a direct correlation of the quality of my work to how tired I was. Once up, I started sanding. I draped a plastic cloth over the entrance to protect the house and our bedroom from the drywall dust. It didn’t help. Dust went everywhere and Jen basically had to wash everything. No treatment today after all, maybe tomorrow.

Sunday, August 2, 2009

Drywall is so..dry

Drywall seems so easy but there’s a lot more to it than you might think. First off, if what you’re drywalling isn’t perfectly square, then putting up drywall will be tricky. Second, you really have to get your joints right or you’ll pay later. Couple of other things, screws are better than nails but nails are cheaper. For the garage side, you have to use a fire-resistant drywall. Basically, it’s the same stuff, but a little thicker and it doesn’t really slow a fire down. But it’s code so I put it up.

I cut into the drywall in the hallway today. This was scary stuff. Hey, I’m cutting into a perfectly good wall in my house. Anyway, I did that and created an entry into my framed closet. About then I realized that the floor I created in my new closet was at a different level than the floor in my house. Yup, all that measuring for nothing.

Anyway, I cut drywall like a mad man and made three trips to HD. Two for drywall and one for more screws. EOD, all the drywall was up. The garage is getting pretty messy though.

Friday, July 31, 2009

The closet

Try to picture a large rectangle where the left side includes the sinks, pocket door toilet and shower and the right half is a big closet door and closet. The plan called for using the entire space for the bathroom. That was fine except Jen had this thing about wanting a closet. So I had to build a closet somewhere first, transfer our clothes, then I could tear down the bathroom.

The hallway into our bedroom and across from the bathroom shares a wall with the garage. I determined that if used up room in the garage, I could create a closet and make an entry via the hallway.

The first test was to ensure that I could get the SUV in even with the future reduced space. It was tight but it worked. I went to Home Depot, purchased some 2x4's and a nail gun. A nail gun is a very cool tool that makes framing go so much more quickly. Even if you have a small job, I highly recommend this. The issue is that you'll need a compressor, so it is not a cheap purchase, all told.

My plan was to frame the whole thing out and get as much drywall up as possible before violating the drywall inside the house and creating an opening where construction dust could come in.

Problems to overcome: The floor in the house is about 19" above that of the garage floor, So determining exactly how high to build the floor was tricky. Also, you have to factor in the thickness of the plywood.

The framing went pretty quickly and despite all my measurement tools, it still didn't come out perfectly square. I can't figure that out. I measure, I use a level and a square. How hard is it to have something square?

Okay, there were a few other problems. One, this closet is sort of in the corner of the garage. The corner is drywalled. I wanted to retain that if I could. But then I have to attach the wall I'm building to the existing wall and I'd like all of this to be sound and up to code. Naturally there was no stud right where I wanted it to be So I had to do something that might not be completely structurally sound but will last as long as the house. I told Jen that if we had an earthquake, take shelter somewhere besides the new closet.

Justification



So the background is that we moved into a 70's house that was decorated in 1972 and then carefully maintained. That includes lime green floral wallpaper, bad carpet, and other stuff that would make you say ewww. But the house is on a great lot and there's a great deal we like about it.



The master bedroom is the worst. Green countertops with build in sinks, wall paper coming off the walls, a pocket door that hides a toilet that leaked blue fluid through the front of the tank. One must navigate past this mustard/blue monstrosity in order to get to a plastic shower with gold trim. There's no fan, but there is a very small, metal frame window that leaks when it rains. The bathroom is completely carpeted and while warm, it's....well lets face it. One should not have carpet in the bathroom.

For some medical reasons decided just recently to stop saving and just go for it. Put in a jetted tub and some other stuff and create a spa-like environment. So I spent a couple of months planning it all out.

Sketchup is a cool program. I took way too long with this but finally found the layout that I liked with exact measurements when possible. I then took another long stretch to select the toilet, tub, fixtures, shower heads, steam shower engine, etc and figure out what that would cost. Then I decided to take even longer finding better prices on the above stuff.

With my asset list in hand and a bit of mark up for "stuff happens" I went to Jen for approval.

Jen wasn't quite in the right frame of mind evaluate design and financial considerations so it turned out that I could do pretty much whatever I wanted. It also meant that when I screwed everything up, it was all on me.

The first step started a week or two ago with the creation of a closet.