Wednesday, August 12, 2009

Plumbing

Okay, so the Y and T connectors for the vents are ready to be connected to, but I haven't framed anything in the bathroom, so I won't be able to finish the venting until later. Here's when I took my trusty rag and shoved it into the opening to prevent noxious gas from escaping into the sterile environment of my workspace.

So today we turn our attention to fresh water plumbing. Basically, I just needed to run lines to the future location of the toilet, shower, and tub. Actually, I just need to bring the lines close to that spot and rough it in. The existing piping for the sinks sinks is about 6" off from where it will need to be, but I'm going to put a bend in that when I get to that portion of our show. I capped off the water line for the toilet during demo so now I need to turn off the house water main and start cutting and sweating. That's when I started thinking about water pressure. My plan calls for a shower with water jets, a normal shower head and an overhead, 4-head "rain" system by Kohler. The tub is decent size and we've got two sinks. I'm a little worried about water pressure. Back to the internet.

The recommendations from Kohler were for 3/4" pipe instead of the standard 1/2". More flow. Makes sense. Course, that means that the primary hot and cold lines coming into my bath are inadequate. I traced the lines back and in my basement above the pool table there actually are 3/4" lines that split off and become 1/2". I could just extend that into my bathroom. Course, I wasn't really planning on this change either.

Okay, after a trip to HD, I was back and prepared to open a line in my basement that was directly over my pool table. Subsequently, this was VERY dangerious work. I cut, put in my connector and began to sweat the pipe. It didn't work. This took many attempts, many cuts and lots of swearing. Once back at HD, I asked about this and the problem is that the line that still connects to fresh water is cold and likely still wet. Apparently an old trick is to shove a piece of bread up in the pipe. The bread absorbs the water and eventually disolves. This allows a dry opportunity to begin the sweating. This was still tough and because it wasn't completely dry, the weld didn't hold and it leaked. I had to break it apart, sand, cut...more leaks.. wash, rinse repeat.




The image to the right show my 3/4" pipe headed into my bathroom. A plumber would not give me any points for prettiness, but it worked so I'm movin' on.



Each time I want to do something with the water, I have to turn the house main off. This is one of those old round valves that is already showing signs of moisture around it. So I say a little prayer to the gods to keep the valve from blowing off while I'm turning it off and on. To avoid this, I thought it would be a good idea to install shut off valves for just the bathroom. For whatever reason, I couldn't make this happen. I bet I shoved an entire baguette up that pipe and it still wouldn't sweat. Just kept breaking off in my hand. Now each time I fail I need to break this thing off, sand and in one case, go to HD and buy a new valve. It was getting late and Jen would likely like to have some water in the house before too long. I went back to HD to find some kind of miracle. I found it in the form of an expensive connector called a SharkBite. Simply put, they just connect to copper pipes like tinker toys. You can put them on and take them off all day, and they are approved for behind-wall use. I would never use anything else expect they are expensive. The only bad thing here was that I spent most of my day overcoming this problem and buying more pipe before I came to this solution.

The water is back on, nothing appears to be leaking, the pool table is intact and Jen doesn't know how close we came to a flooded basement. I'm golden.

Tuesday, August 11, 2009

Staring at the walls

I spent a good part of the begining of this day sitting in a chair in the bathroom approximately where the bench will be in the shower. One of the problems I have is knowing what to do next (or first) so the next step is easier. I started making daily project lists just so I wouldn't stall. I've actually sat in this seat for over an hour at a time completely paralyzed. So for instance, I can't run the vents up to the roof until I frame in the shower. I can't frame the shower until I know the exact dimentions on the tub which will border the shower. I also need to know the exact dimentions of the shower, which is largely dicated by the bench size, where I am now sitting. I've often asked Jen to bring me my dinner in the shower.

By the way, I now have in my garage the jacuzzi tub, toilet, shower fixtures, steam engine, towel racks and other stuff I bought. All told, there's quite a bit of cash encased in cardboard in what is now a very dusty garage. Oh, and in case you're interested...I've never installed a toilet or a toilet, made a shower or plumbed a shower. I have hung a towel rack before.

Course, I still have more plumbing to do. I'd better get going.

Monday, August 10, 2009

Where the drain goes

Today began as most do with a trip to HD. By the way, Lowes is only marginally farther away but I found that by shopping at just one store for most of the stuff I wouldn't have to remember where something came from when I wated to return it.


So now I know where the drain goes. It goes down over there and then meets up with the drain from a sink or something, then sort of goes over there and meets up with a large, vertical tube called the Main Stack. All of the tubing I'm removing has served for 35 years carrying stuff I don't want to think about so I tried to get Jen to make the cuts. That didn't work so I doubled up on my gloves, put on my welding mask and a hoodie and got down to business.

Now at this point in the game the studs are exposed, and I've torn up a section of the floor and exposed the crawl space below. The exsiting waste tubing is there, along with the exisitng fresh water piping, electrical, and a lot of HVAC. I pasted the Plumber Tom Approved Plan up on the wall to give me comfort that I wasn't destroying my house and began cutting. During this process, I went to HD three times, purchasing parts and returning pieces that I didn't think I needed but later purchased again. One other note on going to the same place to buy supplies. The people there get to know you and you get to know them. I was able to determine who was a really good plumber and who was just some shmo assigned to the plumbing section. Over the last while we've gotten to know each other a bit and a couple of the good ones have given me some good tips and verified the information I got from the internet.

The good thing about working with tubing is that it goes together super easily. The bad thing is that the glue actually bonds with the plastic and becomes one, so this stuff is never coming apart. Once you goof, you're cutting. I cutted.

I'm getting more comfortable crawling around in the crawl space. It kind of creeped me out at first but with some of the floor removed and the radio on, the 2 1/2 foot dirt area is becoming more familiar.


By the end of the day, I had my level out and measuring tape to ensure the proper downslope. Turns out that too much slope can be bad too, so there's an actual need for accuracy. I had to move one of my HVAC vents that was in the way (that means a completely different trip to HD). The waste tubing is all in there now.