Saturday, August 8, 2009

Waste Plumbing

Okay, so I have a new plan. Jen's plan didn't work completely but in general we're going with her suggestions with a addition of a half wall and some other stuff. So today I marked out stuff like where the toilet drain needed to be, the shower drain, the tub, sink water lines etc. This required that I look online and find out the dimentions for the tub drain for the tub that hasn't arrived yet. The Kohler toilet we bought came with a handy-dandy plastic template. I'm making the shower so basically that drain can go anywhere and the sink drains will be close to the same spot they are in.

Now, a word on venting. You know those strange pipe that stick out of your roof? I always wondered what those where and why they were open. Bugs or something could get in the house right? Turns out these are plumbing vents so any bug that climbed down one of these would be a certain gonner in my house. But the drains and waste venting also have a lot of rules around it like slope, distance from main stack, number of drains on a single waste pipe, vents per water feature, etc. I should mention here that I don't know a thing about any of this. It was back to the books and online. The deal here is that there are codes around this stuff and since each bathroom is unique, there is no "one way" to do this.

I took some time to tear up a portion of the floor. This again, is hard. I guess these things are meant to stay down. I wanted to preserve what I could and make it easy for me to put a new portion of the floor down. Bascially I just ended up setting my skill saw at 3/4 in and went to town with the saw and later my trusty crow bar.

The toilet was just about the maximum distance from the main stack and that while I came up with a plan, I started getting nervous that once put in place, I'd never know if it worked until the entire bathroom was completely finished. So, I called a plumber and asked for the most senior guy.

This guy came by in no time. I think he was really interested in this job. I wasn't asking him to fix a leaking pipe, but rather to review my paper plan and view the construction area and give me some advice. This was great. I wanted to do everything myself, but this was good money spent. He confirmed the stuff I knew and then told me some things I didn't. He changed my plan a bit and then instead of charging me his hourly rate, just asked for $60 and gave me his home phone in case I had any follow up questions. Then we chatted about my plans for the bathroom. Everyone always seems to ask about the shower. I'm curious about that myself to be honest.

Friday, August 7, 2009

Let's change the plan at the last minute



It's easier to see the lay of the land and plan things out when all the fixtures and walls and stuff are out of the way. So I returned to the plan and marked the floor with tape. Good to check stuff like this out anyway. Code considerations can be illustrated as well like, the toilet has to be 16-odd inches from the wall, where the electrical outlets will be and is there enough room to walk around in the shower. I had this plan all worked out in sketchup. I'd had it for weeks/months since the planning doesn't cost anything. But now that I'm knocking down walls....


I decided to bring Jen in again just to show her my plan now that I was down to studs. Nothing was going to be where it was before sadly. The toilet was going to be on other side of the room, the shower oriented differently thereby requiring a plumbing change, we never did have a tub. And all the electrical would be new and in new places. Jen saw my plan with everything taped out and well, had some "suggestions." Unfortunately for me, her suggestions were good ones, only irritating me further. Basically she suggested that the shower go over here and the toilet over there. Stuff like that.



I pulled up the tape and laid out a new bathroom.

Thursday, August 6, 2009

The Demo

So I came up with the idea of using regular wood doors as bypass doors. This closet is right across from the bathroom and I’m going to put up a really nice wood door on the bathroom. If I match all that, it will work. I spent all day searching for a triple bypass door hanging system that would support three wood doors. This was not easy. At the same time, I had to select the larger but matching door for the bathroom. The place in Boulder was competitive so I went down and ordered it all. It’s knotty pine. Knotty Alder is better, stains better and smells better. Alder is far more expensive so we’re going to live with smelling pine.

The doors are going to come unfinished. How hard could it be to stain a door? Just kidding. With my luck I'll stain it with acid or something and be screwed. Well, at least I have a plan. The concern is that the overall thickness of three doors is larger than the width of the wall. Yup, gonna figure that one out some other time! Onto demolition.

I watch a lot of those do it yourself shows. All of them pretty much start with demolition. They always make it look kind of fun. You grab a sledge hammer and have a ball. The reality is that this is not so easy. First off, when you break through the drywall, dust goes flying and your wife might cry out about all the clothes she just got done cleaning. The other thing is that you have to have somewhere to throw the debris. I called HD on their take-away bin. They advertise it in several places in the store. Course when I called no one knew anything about it. We elected to pile all the debris into an enormous tribute to deconstruction in the garage until a removal plan was actually devised. For the sinks and spanish-esque fixtures, I took those down to the building supply recycling place here Eco-cycle. He took the shower, mirror doors, and everything else but very reluctantly took the lime green counter.

I tried to pull everything down in big pieces. This added some time and don't know how worth it it was. First I pulled out the mystery material counter/sink. Then came the cabinets. Note to do it yourselfers. The cabinets work as a great work bench out in the garage. Taking the toilet out was nasty work. I tried to get Jen to do it but that didn't work. The shower came next. The plastic floor of the shower was bracketed to the floor in some mysterious way with commercial grade bolts. That part of the floor needed to come up anyway. A crowbar is a very important tool.

You can kind of see in the above picture a dowel-like thing at the entrance of the bathroom. I've removed them now and I still have no idea how they were installed. The sawsall is a very important tool.

Wednesday, August 5, 2009

Just make your own closet doors

So I saw these bypass doors in HD that I really liked. They look kind of like a cabinet door where the panel is frosted glass. Turns out they are dang expensive for the size I need. I figured I was eventually going to make the cabinets for the bathroom, so I should make these too.

Today was about measuring and planning, and more measuring. I went and bought the hardwood at a specialized lumber shop. It’s pretty cool buying nice wood. In this case, it was maple.

I hadn’t figured out the frosted glass but figured I could get that easily enough. But then I felt odd about it and drew a scale model on cardboard. That’s when I realized that these doors are really wide. Maybe I should call and make sure someone has this before I start cutting up the wood. Turns out, frosted glass is really, really expensive. You can put a frosted film on regular glass, but even that is dang expensive. You have to use a safety glass inside. So after adding it up, the doors at HD are less expensive than what I could build it for. Back to HD.

Yup, you guessed it, HD doesn’t have any remaining in this size and they aren’t selling them anymore. Yup, they're not selling them anymore. None where advertised online and so my closet doors are basically no more. Yea. So they're too expensive to make and I can't buy the ones I wanted. Juuuuuust great. The guy at the lumber shop was nice enough to take the wood back.

Tuesday, August 4, 2009

Even more drywall

So if I really cared, I would sand more but I started to think, you know, most people can’t even see the walls in a closet. Slight blemishes here and there won’t even be see. Onto mudding without further ado.


I hooked the sprayer up and away I went. This thing clogs up with some regularity and it is something of an art form to get it right. If you concentrate in one area for too little or too long, it will look funny. One other thing I found out is that it doesn’t work when spraying the ceiling. See, the bucket on top of the sprayer doesn’t have a lid. So you can’t just spray straight up. So I angled upward and walked around in circles in the closet until I got it done. At this point I have a new closet with finished walls and a plywood floor. I saved the carpet from the old closet and figured that would do. Course I don’t have any of the tack strips so it was off to HD.

I bought the tack strips for the carpet and some new trim. I threw the trip up and then went to town painting. Luckily it’s a pretty small space so it went quickly. I hate priming as you basically have to do everything twice. I’m also bad at cleaning my rollers in a way that they can be used again. I don’t know how pros do this. They always end up clean but crunchy. Another thing here is how to properly clean off your things with paint. Does it just go down the sink? Seems bad. I am uncertain on this so let's not publicize what I actually did. Anyway, the closet is painted and it reasonably matches the color of the room. I put the tack strips down and then hammered the carpet into the strips. You’re supposed to stretch it out, but I figure at some point I’ll put down cedar floors or something. So I just put it down with the old pad. It looks okay. There’s a 3 ½” gap between the hallway carpet and the reused carpet in the closet since this is where the wall once was. I’ll figure that out I guess.

Number of trips to Home Depot is getting high. I spoke with Ralph today. He suggested that any good home improvement project involves one person doing the work and another person whose sole job is to wait in the HD parking lot with a fully charged cell phone. Once he gets the call, he goes in and purchases the item, brings it to the house and then returns to the parking lot for further instructions. I laughed so hard at this absurd concept. Later on I started thinking about who I know with a truck.

Monday, August 3, 2009

More drywall

I searched around for a drywall treatment sprayer. The rest of the house is done in orange peel so I looked for that. Lowes had one for $60 that was a cheaper version of the professional version. Basically, you mix up your mud, put it in a big container , turn on the compressor and spray away. First I had to tape and figure out all my joints. Basically, I suck at this. I’ve seen guys take a trowel and spread tape and mud in one swipe and require no sanding. This is not me. I struggled all day and it looked pretty crumby by the time I was done.


I tried to be more careful with the taping on the inside of the closet, but really I wasn’t much better. Doing the ceiling was hard and I found there was a direct correlation of the quality of my work to how tired I was. Once up, I started sanding. I draped a plastic cloth over the entrance to protect the house and our bedroom from the drywall dust. It didn’t help. Dust went everywhere and Jen basically had to wash everything. No treatment today after all, maybe tomorrow.

Sunday, August 2, 2009

Drywall is so..dry

Drywall seems so easy but there’s a lot more to it than you might think. First off, if what you’re drywalling isn’t perfectly square, then putting up drywall will be tricky. Second, you really have to get your joints right or you’ll pay later. Couple of other things, screws are better than nails but nails are cheaper. For the garage side, you have to use a fire-resistant drywall. Basically, it’s the same stuff, but a little thicker and it doesn’t really slow a fire down. But it’s code so I put it up.

I cut into the drywall in the hallway today. This was scary stuff. Hey, I’m cutting into a perfectly good wall in my house. Anyway, I did that and created an entry into my framed closet. About then I realized that the floor I created in my new closet was at a different level than the floor in my house. Yup, all that measuring for nothing.

Anyway, I cut drywall like a mad man and made three trips to HD. Two for drywall and one for more screws. EOD, all the drywall was up. The garage is getting pretty messy though.