Saturday, August 8, 2009

Waste Plumbing

Okay, so I have a new plan. Jen's plan didn't work completely but in general we're going with her suggestions with a addition of a half wall and some other stuff. So today I marked out stuff like where the toilet drain needed to be, the shower drain, the tub, sink water lines etc. This required that I look online and find out the dimentions for the tub drain for the tub that hasn't arrived yet. The Kohler toilet we bought came with a handy-dandy plastic template. I'm making the shower so basically that drain can go anywhere and the sink drains will be close to the same spot they are in.

Now, a word on venting. You know those strange pipe that stick out of your roof? I always wondered what those where and why they were open. Bugs or something could get in the house right? Turns out these are plumbing vents so any bug that climbed down one of these would be a certain gonner in my house. But the drains and waste venting also have a lot of rules around it like slope, distance from main stack, number of drains on a single waste pipe, vents per water feature, etc. I should mention here that I don't know a thing about any of this. It was back to the books and online. The deal here is that there are codes around this stuff and since each bathroom is unique, there is no "one way" to do this.

I took some time to tear up a portion of the floor. This again, is hard. I guess these things are meant to stay down. I wanted to preserve what I could and make it easy for me to put a new portion of the floor down. Bascially I just ended up setting my skill saw at 3/4 in and went to town with the saw and later my trusty crow bar.

The toilet was just about the maximum distance from the main stack and that while I came up with a plan, I started getting nervous that once put in place, I'd never know if it worked until the entire bathroom was completely finished. So, I called a plumber and asked for the most senior guy.

This guy came by in no time. I think he was really interested in this job. I wasn't asking him to fix a leaking pipe, but rather to review my paper plan and view the construction area and give me some advice. This was great. I wanted to do everything myself, but this was good money spent. He confirmed the stuff I knew and then told me some things I didn't. He changed my plan a bit and then instead of charging me his hourly rate, just asked for $60 and gave me his home phone in case I had any follow up questions. Then we chatted about my plans for the bathroom. Everyone always seems to ask about the shower. I'm curious about that myself to be honest.