Staying focused on one thing and maybe one day actually finishing something I start would be a nice change. So in that effort, I've decided to stay focused on the shower. It's got a cool concrete shower pan and bench in there now. Course the plumping is done. And at this point, standing in my shower and staring at the pipe ends that will one day become my shower heads, I realized something. It turns out that I measure the optimium height when I was standing on plywood. Now I'm five inches higher and that shower head is lower. Normally this would be a big mistake, but I wanted a really tall shower head so you never had to bend down for any reason. Now I have a "normal" height shower head. Dodged a bullet.
Cement board is easy to hang but a pain to cut if you're cutting small, intricate cuts. I sacrificed a blade on my jig saw. I'm sure this isn't the recommended method but it worked quickly for me. Lots of stupid holes for the valves and shower heads had to be done. The ceiling was tough. That stuff is kind of heavy.
I had another general question about steam showers for which I found no answer. If you want the whole thing completely sealed (basically water proof) so that the steam doesn't go through the tile and into the walls, then it seems it's a bad thing to punch a hole in the vapor barrier for the shower heads and knobs. I mean, it's got to be done. I don't know how other folks overcame this. I think they don't do anything at all and figure the shower vapor barrier is "mostly waterproof." What I decided to do was make the holes as small as possible and then squirt a bunch of silicon caulk in there to seal vapor barrier around the pipes. Couldn't hurt.
Cement board is up, everything is sealed (I think), and the thing is starting to look like a shower. Or at least a small, grey room with a bench that slopes ever so gently toward the drain.
Saturday, August 29, 2009
Friday, August 28, 2009
The Shower Pan
I haven't blogged for a while. Mostly because I've just been staring at the "Disaster Zone" and wondering how much it would cost to have someone finish. But then Jen made me some chocolate chip cookies and now I'm back on top.
The internet provides a log of good information on how to do stuff and the comment boards out there help too. So I was surprised to find how little information there is on building a steam shower, and in particular, building a shower pan. It mostly comes down to liners and stuff but you'd think someone would capitalize on this gap.
I'll skip a few steps here, but it starts with the pan. I had to make sure much earlier in the project that the floor could support the tub, 60 gallons and two people, along with a cement shower pan. Basically there are a few layers here. I used concrete grout made by Quickcrete. This stuff is designed to repair bridges and is much easier to work with than cement. I poured a base which is just designed to slope in toward the drain and support the pan. There was no guidance at all from anyone on the building the curb (where the door to the shower will be). I framed it out with 2x4's but what to do to make it part of the shower pan was not clear. Since I'm pouring mortar, I just decided to make it a wall of mortar. I made a mold, poured the mortar and had a pretty little wall which would be where the door was. Not sure how the pro's do this.
Once that hardened, I could put the liner down. This is basically a very thick plastic that HD sells for this purpose. It's very hard to fold in the corners. At this time I put in the thiner vapor barrier (Plasic sheet) around the whole shower. If you ever do this, get someone who is good at gift wrapping. You're basically wrapping a box with a single sheet of plastic, while standing in the box. The fewer cuts I had to make the less of an opportunity there'd be for water to get through.
Once done, I could then work on the drain and put all that down (skipping ahead quite a bit here). Then I mixed up a lot more quickcrete and basically poured and formed my shower pan.
There's a pretty accurate description of the process with pictures here. http://www.ontariotile.com/preslope.html This looked pretty much like mine.
The fear facor came in when I realized that if I had made a mistake of some kind, I now had 100 pounds of hard mortar in my bathroom. Anyway, at the end of the day today I had a liner in there and a new shower pan. As long as water goes down the drain and not down through the floor, I'm going to be happy.
Monday, August 24, 2009
Closet doors
I hung the closet doors today. I bought the three closet doors but they were unfinished. I found out that you need to pretreat pine so that the stain doesn't get blotchy. What I did find out is that it can get blotchy anyway. So I'll make this entry quick. I thought staining was easy, but it isn't. You can have streaks and stuff just like paint. Doors are trickier because of the panels and grooves and such.
I had a really hard time finding a tripple bypass door hanging system. I finally found one that wasn't $300 sold by Johnson. Anyway, I had stained the doors and then put coats of urethane on various days since I started the project. They've just been down in the basement drying because I don't like staining or cleaning the brushes. Oh and in one case I had to sand one side down and go again. Blotchiness.
I also had to made the floor tracks for the doors. I basically took a long 1x6 and cut three grooves down it with the router. More staining for that thing and finally I was ready.
The picture at the right also shows the bathroom door. It came in late so I didn't stain them all at the same time.
I need batteries to show the final hung doors. I'll take a picture later.
Subscribe to: