Saturday, August 29, 2009

More shower

Staying focused on one thing and maybe one day actually finishing something I start would be a nice change. So in that effort, I've decided to stay focused on the shower. It's got a cool concrete shower pan and bench in there now. Course the plumping is done. And at this point, standing in my shower and staring at the pipe ends that will one day become my shower heads, I realized something. It turns out that I measure the optimium height when I was standing on plywood. Now I'm five inches higher and that shower head is lower. Normally this would be a big mistake, but I wanted a really tall shower head so you never had to bend down for any reason. Now I have a "normal" height shower head. Dodged a bullet.

Cement board is easy to hang but a pain to cut if you're cutting small, intricate cuts. I sacrificed a blade on my jig saw. I'm sure this isn't the recommended method but it worked quickly for me. Lots of stupid holes for the valves and shower heads had to be done. The ceiling was tough. That stuff is kind of heavy.

I had another general question about steam showers for which I found no answer. If you want the whole thing completely sealed (basically water proof) so that the steam doesn't go through the tile and into the walls, then it seems it's a bad thing to punch a hole in the vapor barrier for the shower heads and knobs. I mean, it's got to be done. I don't know how other folks overcame this. I think they don't do anything at all and figure the shower vapor barrier is "mostly waterproof." What I decided to do was make the holes as small as possible and then squirt a bunch of silicon caulk in there to seal vapor barrier around the pipes. Couldn't hurt.

Cement board is up, everything is sealed (I think), and the thing is starting to look like a shower. Or at least a small, grey room with a bench that slopes ever so gently toward the drain.

No comments:

Post a Comment