Saturday, November 14, 2009

The Tools it Took

I've been travelling for work for about a month now so I haven't done much work on the bathroom. I think that's come to an end so I should be able to get back to it this weekend. For now though, I thought I'd share something that keeps occuring to me when I think about the budget.

In the begining, I created a project budget spreadsheet and included the normal stuff. The stuff I guessed on and was horribly, horribly off included, lumber (2x4's, plywood, etc), copper pipe (angles, connectors, etc), basically everything having to do with the plumbing, electrical wire (three separate lines pulled from the box to the bathroom). Basically I thought of these things but I was okay being off in my budget because I didn't want to spend the time creating estimates for this stuff. But now that I am where I am, I can see there were a lot of other hidden costs that I didn't expect at all...tools. Let's take a look:

Amounts are approximate
Dewalt nail gun - $129 Not entirely necessary, but it is now my favorite tool
Nail gun nails - $45
Compressor - $60
Drill - $100 (normally I wouldn't inlude this but my drill fried on this project and I had to get another one. Seriously, it actually started smoking and then caught on fire. I yanked the cord out of the socket and then quickly threw it out on the driveway, as if it were a grenade. It continued to smoke and melt for another hour. I inlcuded this in the cost even though this was a gift. Sweet!
Diamond blade for handsaw - $45 (used for cutting curved pieces of tile)
Cement board cutter - $5
Glass cutter - $10
PEX tubing cutter - $15 This can get really sloppy without one of these.
PEX tubing crimper - $30 rented (yeah, these things are really expensive - best to rent if you're organize and can do it all in one day).
Electrical tester (to test resistence for the heated floor) - $45
Router bits for mortise and tennon joints - $99
Saw blade - to make quality cuts for the cabinets - $75
Porter Cable orbital sander - $100 + sandpaper $20
Paint brushes/staining brushes - $25
Tile saw - Borrowed this from Mike. Absolutely invaluable.
Trowel - $10
Drywall texture sprayer - $100 (hint, buy a good one or not at all. Mine was not good)

Tools I already had that are mandatory:
Hand grinder
Table saw
Sawsall - I love this tool
Pipe sweating gear
Drywall square, knive, floor-lifty-seesaw thing, etc
Variety of normal hand tools including a crowbar
Radio (thank you NPR)

I bet there's more but I can't think of anything else right now. Normally I am really excited if I need/get to buy a new tool. But interestingly now, I'm so far over budget that I now shudder at that and try to improvise (using a big screwdriver as a chisel, using wood bits for mason bits, really smart stuff like that).

Let me know if you need to borrow something.

Saturday, September 5, 2009

Every now and again I feel like I'm on the cusp of begin done. That is, I can see the finish. Then Iremember my track record for estimating these things and realize I'm like a year away.

I borrowed a tile saw from Mike a bit too early. I thought I'd be ready to tile in no time and, of course, everything has taken longer that I expected. The tile saw has just been sitting in my garage with all the fixtures and stuff I bought.


By the way, the garage was so full of stuff, that neither car could fit in. I think it will be that way for a while. There is tremendous satisfaction opening a box, installing whatever it is, and then putting the box in the recycle bin. The pile is slowly going down.


Most of the stuff I can't do until I tile (shower heads, toilet and fixtures), but the steam engine did come in and today is the day cause I need a break from everything else.


I ran electrical to the tub and outlets a while back and at that time I ran a very large diameter wire into the crawl space where I planned to put the steam generator. I did some research on these and chose the Thermasol AF SERIES. As part of my tendency to over-engineer, this sucker could comfortably steam the house. Anyway, you can install it above the shower in an attic or below, or someone nearby. I chose the crawl space. I built a cradle under the floor boards where there was water access and where I ran the electrical.



Basically this thing is pretty simple. You have freshwater coming in and steam going up through the floor and to an outlet in the shower. Once again, it's nice to have a 6" wet wall, which I didn't do, so everything was a bit tight.


Note the use of PEX pipe. Good stuff. Flexible and easy to install, but the connectors are expensive. Her eyou can see that I haven't secured them yet.


Nothing much to tell on this day. I got it done. Or at least I think so. Like so many other things, I can't test it because the shower isn't done. I won't know if this works until I've tiled the shower and installed all the fixtures.

Sunday, August 30, 2009

Time for drywall

The great thing about the Explorer is that you can get a 4x8 sheet of drywall in it. It sticks out the back a bit, but it works pretty well. I've got a lot of white scuff marks on the inside. I'll clean that up at some point.

Drywall always seems easy and then for some reason it takes a long time. The ceiling was hard. I didn't use a lift or anything since I only had a few pieces. One way to do this is to stand on a ladder, hold the drywall firm against the 2x4's with your head, take the screws out of your mouth and screw them in with a heavy drill, you can get this done by yourself with no problem. I broke one piece and after 1/ 2 hour called Jen in to help.

Nothing too exciting to tell about this phase. I put cement board around the tub and drywall above that. Drywall everywhere else. Thought I'd get fancy/shmancy and put a little cubby in the 1/2 wall next to the toilet to put rest an airfresher or some other do-dad. By the way, this wall is full height but sticks out from the wall about 2 1/2 feet. It separates the toilet from the bath sinks and provides some privacy to the toilet area. I figured this would be a great place to use the less expensive and easier to handle 1/4 inch drywall and not the 1/2. I'm so smart.

In the picture to the right you can see the wall I was talking about framed out. Also a ladder, deck for the bath, cement board, my level which I can never seem to find when I need it, and some general rubble.

I had arranged for a drywall guy to come by a few days ago. My think here is that I did a rotten job on the wall treatment on the closet and I wanted a specific treatment on the wall. We're going for an Italian plaster look here, not a oversprayed orange peel like what I did before. So this guy showed up to take a look and had a few polite comments. First of all, I'm an idiot for using drywall nails in some places. Apparently nails work their way out over time. I'm also an idiot for using 1/4 inch drywall. Guess I'm not so smart. The reasons here were less clear, but this guy was 83, had been doing this his whole life and was charging me near dirt. So I didn't argue.


The "skip trowel" method looked easy but I'm certain it would have taken me a week and I would have never been happy with it. It took this semi-retiree finished it in just over a day. I also had him clean up a few areas in the bedroom that had cracks in the walls. This guy was great.


So let's see. I did okay working out the places for the pipes and outlets in the drywall, that's always a bit tricky, and I did a good job bringing in a professional to hide or fix all my drywall mistakes. I'm feeling Pretty good.
I don't have a picture of this phase so here's a picture of my shower gift wrapped in vapor barrier. If you look closely you can see the overhead plumbing for the "rain" shower head.

Saturday, August 29, 2009

More shower

Staying focused on one thing and maybe one day actually finishing something I start would be a nice change. So in that effort, I've decided to stay focused on the shower. It's got a cool concrete shower pan and bench in there now. Course the plumping is done. And at this point, standing in my shower and staring at the pipe ends that will one day become my shower heads, I realized something. It turns out that I measure the optimium height when I was standing on plywood. Now I'm five inches higher and that shower head is lower. Normally this would be a big mistake, but I wanted a really tall shower head so you never had to bend down for any reason. Now I have a "normal" height shower head. Dodged a bullet.

Cement board is easy to hang but a pain to cut if you're cutting small, intricate cuts. I sacrificed a blade on my jig saw. I'm sure this isn't the recommended method but it worked quickly for me. Lots of stupid holes for the valves and shower heads had to be done. The ceiling was tough. That stuff is kind of heavy.

I had another general question about steam showers for which I found no answer. If you want the whole thing completely sealed (basically water proof) so that the steam doesn't go through the tile and into the walls, then it seems it's a bad thing to punch a hole in the vapor barrier for the shower heads and knobs. I mean, it's got to be done. I don't know how other folks overcame this. I think they don't do anything at all and figure the shower vapor barrier is "mostly waterproof." What I decided to do was make the holes as small as possible and then squirt a bunch of silicon caulk in there to seal vapor barrier around the pipes. Couldn't hurt.

Cement board is up, everything is sealed (I think), and the thing is starting to look like a shower. Or at least a small, grey room with a bench that slopes ever so gently toward the drain.

Friday, August 28, 2009

The Shower Pan

I haven't blogged for a while. Mostly because I've just been staring at the "Disaster Zone" and wondering how much it would cost to have someone finish. But then Jen made me some chocolate chip cookies and now I'm back on top.


The internet provides a log of good information on how to do stuff and the comment boards out there help too. So I was surprised to find how little information there is on building a steam shower, and in particular, building a shower pan. It mostly comes down to liners and stuff but you'd think someone would capitalize on this gap.


I'll skip a few steps here, but it starts with the pan. I had to make sure much earlier in the project that the floor could support the tub, 60 gallons and two people, along with a cement shower pan. Basically there are a few layers here. I used concrete grout made by Quickcrete. This stuff is designed to repair bridges and is much easier to work with than cement. I poured a base which is just designed to slope in toward the drain and support the pan. There was no guidance at all from anyone on the building the curb (where the door to the shower will be). I framed it out with 2x4's but what to do to make it part of the shower pan was not clear. Since I'm pouring mortar, I just decided to make it a wall of mortar. I made a mold, poured the mortar and had a pretty little wall which would be where the door was. Not sure how the pro's do this.


Once that hardened, I could put the liner down. This is basically a very thick plastic that HD sells for this purpose. It's very hard to fold in the corners. At this time I put in the thiner vapor barrier (Plasic sheet) around the whole shower. If you ever do this, get someone who is good at gift wrapping. You're basically wrapping a box with a single sheet of plastic, while standing in the box. The fewer cuts I had to make the less of an opportunity there'd be for water to get through.
Once done, I could then work on the drain and put all that down (skipping ahead quite a bit here). Then I mixed up a lot more quickcrete and basically poured and formed my shower pan.


There's a pretty accurate description of the process with pictures here. http://www.ontariotile.com/preslope.html This looked pretty much like mine.


The fear facor came in when I realized that if I had made a mistake of some kind, I now had 100 pounds of hard mortar in my bathroom. Anyway, at the end of the day today I had a liner in there and a new shower pan. As long as water goes down the drain and not down through the floor, I'm going to be happy.


Monday, August 24, 2009

Closet doors

I hung the closet doors today. I bought the three closet doors but they were unfinished. I found out that you need to pretreat pine so that the stain doesn't get blotchy. What I did find out is that it can get blotchy anyway. So I'll make this entry quick. I thought staining was easy, but it isn't. You can have streaks and stuff just like paint. Doors are trickier because of the panels and grooves and such.
I had a really hard time finding a tripple bypass door hanging system. I finally found one that wasn't $300 sold by Johnson. Anyway, I had stained the doors and then put coats of urethane on various days since I started the project. They've just been down in the basement drying because I don't like staining or cleaning the brushes. Oh and in one case I had to sand one side down and go again. Blotchiness.




I also had to made the floor tracks for the doors. I basically took a long 1x6 and cut three grooves down it with the router. More staining for that thing and finally I was ready.


The picture at the right also shows the bathroom door. It came in late so I didn't stain them all at the same time.
I need batteries to show the final hung doors. I'll take a picture later.

Friday, August 21, 2009

Time to test the water

The plumbing on the shower and the tub are done. I just need to put the valves in on the sink and plumb the toilet. The fauctes for the sink are going to be coming out of the wall. They look pretty cool in the pciture but I've never done this before. My big problem is how deep in the wall to mount them see, they have to stick out a specific amount so that the pretty part of the faucet is flush with the wall. My issue is that my wall includes drywall, tile and an indeterminate amount of mortar.

I've been avoiding this for some time but today is the day. I measured some 12 times including two eyeball / sanity checks. They have to be centered in a space that isn't complete yet so it's a bit tricky. They also have to be the right level above a sink that isn't there yet. The actual installation isn't that hard. I put a 2x4 in the wall and screwed the bracket that holds the valve up to it. Then remeasured just for fun to make sure. Good thing I did too because after all that I was off by 1/2 inch. I took it down, and moved it then remeasured. Then determined I was right the first time and moved it back. Jen decided it was lunch time so I quickly agreed to stop.


More sweating of pipe with trusty torch. By the way, I didn't factor any copper pipe into my budget. Copper pipe is expensive. A little while later the valves to the sink were connected to fresh water pipes.

The last bit was taking fresh water to where the toilet was going to be. This toilet calls for water to come out of the wall and not the floor. Means a few more bends and stuff but wasn't my biggest problem today. I plumbed that and capped it off so that I have a pipe sticking out of the wall waiting for my toilet..one day.

Okay, now to test the water. The tub plumbing is completely done and I put plugs into the outlets of all of my shower fixtures (body sprays, overhead, etc). The valves on the sink will contain the water there, if they're turned off. It's kind of hard to tell. And I capped off the toilet water by welding a cap. So, in theory, if the water were turned on, no water would come out.
I asked Jen to get into the crawl space and showed her the master on/off valves. She can also hear me through the floor. This was pretty nerve racking stuff to be honest. I've had my welds fail before on other projects. I yelled down to Jen "okay, turn the cold on just a wee bit." Folks, it's a bit terrifing when you hear all that water charging the system and you know pressure is now behind all the work done by an unlicensed plumber. We did the hot and eventually worked up to full strength. I don't know what to tell you. It worked. No leaks. Well, except one.
Remember me telling you about the compressions fittings for the tub faucet? Yeah, a very slow leak appeared. I tightened, thentightened some more, then tightened too much and bent the pipe and the leak got worse. Back to McGukins. Tried again. Failed. Back to McGukins. This time buying far more than I needed. Tried again. I was up to three leaks at one point. These are very small leaks that take a while to even see. But they have to be fixed. This was pretty frustrating stuff. But after some 5 attempts including rebending and installing the tubing, it finally worked. I hate compression fittings.

So the water is on. The sinks, toilet, tub and shower pipes have pressurized water in them and I'm not screaming down at Jen "Turn it off! For the love of god turn it off!!!!" I was so surprised by this I sat in my shower chair for about 1/2 hour just staring at the plumbing.