I hung the closet doors today. I bought the three closet doors but they were unfinished. I found out that you need to pretreat pine so that the stain doesn't get blotchy. What I did find out is that it can get blotchy anyway. So I'll make this entry quick. I thought staining was easy, but it isn't. You can have streaks and stuff just like paint. Doors are trickier because of the panels and grooves and such.
I had a really hard time finding a tripple bypass door hanging system. I finally found one that wasn't $300 sold by Johnson. Anyway, I had stained the doors and then put coats of urethane on various days since I started the project. They've just been down in the basement drying because I don't like staining or cleaning the brushes. Oh and in one case I had to sand one side down and go again. Blotchiness.
I also had to made the floor tracks for the doors. I basically took a long 1x6 and cut three grooves down it with the router. More staining for that thing and finally I was ready.
The picture at the right also shows the bathroom door. It came in late so I didn't stain them all at the same time.
I need batteries to show the final hung doors. I'll take a picture later.
No comments:
Post a Comment